Evacuation plans compliant with SS 2875

Evacuation plans that actually read clearly when it matters.

Evacus designs new evacuation plans, updates existing ones, and adapts them to your property and operation. Considered drafting, standards-compliant production and delivery across Sweden.

  • Compliant with SS 2875 & ISO 7010
  • Quote within 24 hours
  • Projects across Sweden

Evacuation specialists

One thing — done properly.

Evacus works exclusively with evacuation plans and fire-safety documentation. You can see it in the result: sharper plans, faster replies and a process that's easy to follow — whether it's a single site or an entire portfolio.

  • Clarity above all

    An evacuation plan should be readable in seconds — not studied.

  • Fixed price and timeline

    You get a concrete quote with price and delivery date before we start.

  • One point of contact

    The same person all the way — from first question to final delivery.

  • All of Sweden

    Based in Gothenburg, projects nationwide — on site or from your floor plans.

A framed Evacus evacuation plan mounted on the wall in a modern hotel reception with wood panelling and natural light.
Reception, hotel — Munkforsplan 37
In real environments

Plans that sit with the reception — not against it.

In public entrances the evacuation plan meets guests, suppliers and staff. We design with the same care as your interior — clear hierarchy, clean typography and a sober frame that lives well with the materials around it.

  • Clear hierarchy

    The most important elements — escape route and assembly point — read first.

  • Sober framing

    Discreet metal or wood frames, matched to the environment.

  • Bilingual

    Swedish and English side by side for international guests.

An Evacus evacuation plan in a metal frame next to an information panel in a modern co-working office lobby with people in conversation.
Lobby, co-working office — Storgatan 14
Tailored to the operation

From head office to hotel lobby — same quality, adapted expression.

We deliver evacuation plans for modern offices, hotels, properties and commercial environments across Sweden. The same standards-compliant content, but with an expression that suits each location — from the design hotel to the corporate floor.

  • Same standard

    Every plan is drafted to SS 2875 — regardless of industry or setting.

  • Consistent expression

    A unified design language across your full portfolio.

  • Scalable delivery

    From a single site to hundreds of properties — in the same flow.

Why choose Evacus

Six concrete reasons to get in touch.

No vague promises — this is what you actually get.

Our promise

Specialists, not a side business

Evacuation plans are our core business. We don't do anything else — and we do it every day.

We don't draw building plans, BIM models or signage programmes on the side — evacuation plans are what we do, every day.

  • 02

    Readability over decoration

    A plan needs to be readable in seconds. We prioritise clear symbols and a strong hierarchy over visual effects.

  • 03

    SS 2875 and ISO 7010

    We follow the Swedish standard for evacuation plans — and use ISO 7010 symbols so the plan is recognisable to anyone reading it.

  • 04

    Works for large portfolios

    We handle individual sites and full hotel or property portfolios in the same standard, with traceable version control.

  • 05

    Timelines you can rely on

    You get a concrete delivery date in the quote — and we keep it. Rush delivery is available for urgent projects.

  • 06

    Projects across Sweden

    Based in Gothenburg, deliveries nationwide — on site with you or from existing drawings.

Quote

Tell us briefly what you need — we reply within 24 hours.

Add the number of premises, type of operation and any timeline in the form. You'll get a concrete proposal back — no obligation.

Reply within 24 hours on weekdays

How it works

Four steps from first contact to finished plan.

A predictable process where you always know where the project stands — and what the next step is.

  1. Step 01

    Send your request

    Briefly describe the operation, number of premises and any timeline in the form. We reply with a fixed quote within 24 hours.

  2. Step 02

    We gather the source material

    We work from existing drawings in CAD or PDF. If material is missing — or doesn't match reality — we book a site visit.

  3. Step 03

    Drafting and review

    Plans are drafted to SS 2875 and reviewed internally before delivery. You get a proof to go through before we go to final production.

  4. Step 04

    Delivery and installation

    You get print-ready PDFs in the correct format. If you'd like printing and installation included, we handle it.

Quality and clarity

An evacuation plan has to work when it really counts.

We design for readability — not decoration. The layout follows SS 2875 and symbols follow ISO 7010, which makes the plan recognisable regardless of the reader's background. That means a guest, a substitute or a visitor who has never seen your premises before will quickly find the evacuation route.

For teams working systematically with fire safety, the plans become a natural part of the documentation — updated, version-numbered and ready for review.

  • Clear hierarchy

    The most important information first — always.

  • Consistent design

    The same look across the whole portfolio.

  • Standards-compliant

    SS 2875 with ISO 7010 symbols.

  • Print-ready delivery

    PDFs at the correct scale and format.

Frequently asked questions

What customers ask us most.

Standards, delivery time, site visits and managing several properties at once. Can't find your answer? Drop us a line in the form and we'll get back to you.